Grain Storage Yard Infrastructure

Industrial | Commercial
Location Brownsville, TX
Dimensions 1,350 ft × 100 ft
Depth 2.5 ft (30 inches)
Area 3.1 acres
Volume 12,500 yd³
Truckloads 569 loads (22 yd³/truck)

Large-scale site preparation for agricultural grain storage facility. Excavated and leveled 3.1 acres to precise elevations for concrete pad installation. Work included removal of soft topsoil, compaction of subgrade to 95% density, and drainage grading to prevent water accumulation around storage structures.

Excavation Grading Compaction Agricultural

Residential Lot Leveling

Residential | Fill Dirt
Location Harlingen, TX
Area 5 acres
Depth 18 inches (1.5 ft)
Volume 12,100 yd³
Truckloads 550 loads

Subdivision development project requiring extensive fill to raise lot elevations above flood plain. Imported 12,100 cubic yards of compacted fill dirt, graded to create positive drainage (minimum 2% slope), and prepared lots for foundation construction. Final compaction testing verified 90% density for residential building codes.

Fill Dirt Grading Drainage Subdivision

Basic Terrain Preparation

Commercial | Site Prep
Location Brownsville, TX
Dimensions 400 ft × 100 ft
Material Fill Dirt
Volume Range 3,704 - 4,444 yd³
Truckloads 168 - 202 loads

Site preparation for commercial warehouse facility. Cleared existing vegetation, stripped topsoil, imported fill dirt to establish desired building pad elevation. Rough grading created positive drainage away from structure footprint. Project completed on accelerated timeline to meet fast-track construction schedule.

Site Prep Land Clearing Fill Dirt Warehouse

Projects Summary

Project Type Location Area Volume Trucks Value
Grain Storage Yard Industrial Brownsville 3.1 ac 12,500 yd³ 569
Road Infrastructure Road Base RGV 2.75 ac 17,778 yd³ 809 $462,000
Residential Lot Leveling Fill Dirt Harlingen 5.0 ac 12,100 yd³ 550
Commercial Topsoil Topsoil McAllen 10.0 ac 8,067 yd³ 367 $322,000
Basic Terrain Prep Site Prep Brownsville 0.92 ac 3,704-4,444 yd³ 168-202
TOTAL (excluding Basic Terrain) 20.85 ac 50,445 yd³ 2,295 $784,000+

Key Metrics

50,445+

Cubic yards moved

2,295+

Truckloads delivered

20.85+

Acres developed

$784K+

Documented project value

Trusted by Leading Contractors

We've partnered with major construction and infrastructure companies across the Texas Rio Grande Valley.

Acciona

Infrastructure

CC Solutions

Civil Engineering

Foremost Paving

Asphalt & Paving

Southern Star

General Contractor

Your project could be next

From small residential lots to multi-acre commercial developments, we have the experience and equipment to deliver results on time and within budget.

Request a Quote View Our Services